Construction and engineering / 01
Construction estimating and quantity takeoff
You get a formula driven Excel workbook in a fixed eight tab format, not a PDF with a number at the bottom. Every quantity is measured rather than assumed, every one of them carries a written basis, and the markup sits in cells you can change.
Quantities, or quantities with a price on them
Some contractors have rates they trust and crews they know, and what they need is measured quantities and a markup they can check. Others want the whole number. Both start the same way and you can stop at whichever point suits you.
Either way it arrives as a working file. Most estimating services send a PDF with a bottom line. You cannot interrogate a PDF, you cannot change the overhead in it, and you cannot hand one trade band of it to a subcontractor. You can do all three with this.
The measurement protocol
This is the part worth paying for, and the part no competitor describes. Speed is not a method.
- 01
Scale is calibrated before anything is measured
Verified against printed dimensions on the sheet, in both the horizontal and the vertical axis. Sheets get rescaled during printing and plotting and a scale bar can simply be wrong. Checking one axis catches a uniform error. Checking both catches a distorted one.
- 02
Areas are verified two ways
A measured area is checked against a second independent measurement of the same region, a vector polygon reconciled against a raster planimeter reading. If the two do not agree within tolerance the area is measured again rather than averaged.
- 03
Minimum sizes are applied consistently
Where a scope has a practical minimum, for example a patch smaller than a crew will realistically cut and place, the minimum is applied, and applied the same way across the whole job so the quantities stay comparable.
- 04
Wastage is carried separately
Measured quantity and wastage sit in different columns. You can see the geometry you are actually buying and change the wastage assumption without touching the measurement.
- 05
Every quantity gets a basis note
Which sheet it came from, and which assumption. When a subcontractor or an owner’s representative challenges a number, the answer is already written down.
The markup exhibit
Drawn on the engineer’s own issued sheets. Geometry is never redrawn, because a redrawn plan is a second document that can disagree with the first.
- Colour coded by scope
- Each measured scope carries its own colour with a legend on the sheet, so you can see at a glance what was counted as what.
- Traceable to the workbook
- Markup regions correspond to takeoff lines, so a line in the file can be found on the drawing.
- An exhibit, not a summary
- It is how you check our work, and it is how you defend the number to somebody else.
The eight tabs, and what each one is for
The format is fixed. It does not change from job to job, and nothing gets buried in a tab you were not expecting.
- 1. Takeoff breakdown
- The measured quantities in ten columns. Scope item, unit, measured quantity, wastage carried separately from the measured figure, and the basis note. This is the tab that gets checked when somebody challenges a number.
- 2. Summary
- The cost cascade. Direct costs roll up by trade band and the markup cascade applies on top. Every figure is a formula pointing at the tabs below, so nothing is typed twice.
- 3. Unit prices
- The rate applied to each item and where it came from. Market rates for the project area, not a national average applied everywhere.
- 4. Labor and crews
- Crew composition and productivity behind the labour line. Where prevailing wage applies the determination is named here rather than folded into a blended rate.
- 5. Equipment
- By item, with duration and rate separated so a longer or shorter programme can be tested without rebuilding the estimate.
- 6. Materials
- With sales tax carried explicitly on the material line, because it is a real cost and it varies by jurisdiction.
- 7. Assumptions and exclusions
- Written so it lifts directly into your bid qualifications.
- 8. Notes
- Judgement calls recorded at the point they were made. If a drawing was ambiguous and a decision had to be taken, it is written here rather than left for you to discover.
The markup cascade sits in editable cells
This is the part contractors notice first, and it is deliberate.
- You set your own overhead and profit
- Built as open cells, not hard coded values. Change your overhead percentage and the whole workbook recalculates. Your margin is your business decision.
- You can strip a band out
- Trade bands roll up through formulas, so removing a scope removes it cleanly rather than leaving an orphaned number.
- You can hand one band to a sub
- A single trade band goes out for a check price without exposing the rest of your estimate.
How the pricing is sourced
- Market rates for the project area, because labour and material in the New York metro and in the Arizona high desert are not the same number.
- Prevailing wage bases applied where the project requires them, named on the labour tab rather than absorbed into a blended figure.
- Sales tax carried on the material line at the rate for the jurisdiction.
- Allowances carried as explicitly labelled allowances, never blended into a measured line, so you can see how much of the estimate is measured cost and how much is a placeholder.
What is excluded by default
Stated here rather than buried. An exclusion you discover at bid opening is worse than no estimate.
- Bonds and insurance, unless the bid documents make them priced items and you ask for them to be carried.
- Permit and agency fees.
- Design work of any kind. Northvex provides no engineering design.
- Escalation beyond the bid date, unless you ask for it and give the period.
- Anything not shown or reasonably inferable from the documents you supply. A scope described in words but not documented is flagged rather than priced.
The fee is quoted before the work starts
Every engagement begins with a fee and a turnaround for the work itself, issued in writing before anything is measured, stated in United States dollars. You approve it, then work starts. There is no situation where an estimate arrives carrying a fee you have not already agreed.
Questions contractors actually ask
What documents do you need from me?
The issued drawing set, the specifications if there are any, any addenda issued to date, and the bid form if it is public work. If the set is incomplete we tell you what is missing before quoting rather than after.
How do you verify the scale?
Against printed dimensions on the sheet, in both axes, before measuring. A scale bar alone is not enough. We have seen a set issued with a graphic scale bar printed at double the sheet’s actual scale, which would have doubled every quantity taken from it.
What happens when a drawing has no dimensions?
The quantity is derived from something that is dimensioned, or from a known element of the structure, and the derivation goes in the basis note. If neither exists it is flagged as not measurable from the documents supplied rather than estimated.
How is prevailing wage handled?
The applicable determination is applied to the labour tab and named there, so you can see which basis the number rests on. It is not blended into a single rate that hides the assumption.
What happens when an addendum lands after you have started?
We tell you what it changes and what it costs to incorporate before doing it. An addendum that adds scope is a scope change and it is handled as one.
Can I edit the workbook?
Yes. It is a live Excel file, not a locked export. The markup cascade in particular is built as editable cells specifically so you can set your own overhead and profit.
Do you perform the construction?
No. Northvex prepares estimates, quantities, drawings and reviews. It is not a contractor, it holds no contractor licence, and it makes no site visits. That independence is the point.
Work of this kind
- Construction
Express car wash, new build
Southern California
Grading, concrete, storm drain and bioretention, sanitary sewer, landscape, site lighting and alley reconstruction. Seven scopes consolidated into one proposal.
Estimating & Takeoff / Bid & Proposal Support
- Construction
Residential remodel and addition
Arizona high desert
Sixteen trades from demolition through electrical, including septic and deck. 132 line items.
Estimating & Takeoff
- Construction
Storm damage trail and shoreline restoration
Coastal Georgia
Independent quantity verification against a contractor’s own numbers, explained line by line.
Estimating & Takeoff
Send the set. Get a fee back.
A written fee and a delivery date come back before anything is measured.














