Skip to main content

Try a trade, a service or a scope. For example concrete restoration, shop drawings, or acoustical ceilings.

Construction and engineering / 03

Engineering support for contractors

The technical work that sits behind a bid and a submittal: reading the engineer’s intent, finding where it cannot be built as drawn, and writing the question so it gets a usable answer.

Construction

What is provided

Constructability review
The set read for what cannot be built as drawn: a detail that does not close, a tolerance that no trade can hold, a sequence the phasing does not allow. Reported with the sheet and the detail, so it becomes a specific RFI rather than a general worry.
Means and methods narratives
Sequence, access, temporary works assumptions and hold points, written to attach to a bid or a submittal.
RFI and submittal preparation
Questions written so the engineer can answer them in one round, and submittal packages assembled to the specification’s own list.
Technical review of quantities and drawings
An independent second reading of a takeoff, a shop drawing package or a proposal before it goes out. Document precedence governs, and the client’s own figures are opened only at the reconciliation step.

Questions contractors ask

Can you design the shoring or the formwork?

No. Temporary works design needs a licensed engineer taking responsibility for it. We will quantify it, sequence it and write the question to the engineer who designs it.

Will you defend a number if the owner’s representative challenges it?

Yes, from the written basis on every line. That is what the basis notes are for.

Is this a delivered service or an offer?

The review and narrative work has been delivered on real bids. As a named service line it is an offer, and it is described here as one.

Work of this kind

Send the set. Get a fee back.

A written fee and a delivery date come back before anything is measured.