Division 32 / Delivered
Division 32 paving, curb and landscape estimating
Paving is an area. Everything around it is a run, and the runs are where the money hides.
What we measure, and in what units
- SF paving by section
- LF curb and gutter by profile
- SF landscape by type
- EA trees and irrigation heads, zones
- LF fence by type
What the deliverable looks like for this division
Paving by area with the section identified, since base and asphalt thickness set the price. Curb and gutter by run and profile, with rolled against vertical and the transitions between them counted. Landscape by area and count, irrigation by zone from the irrigation plan.
Scope items routinely missed on this division
Only someone who has priced the work knows what falls through the gaps. No competitor publishes this list.
- Curb and gutter in linear feet against paving in square feet, taken as different quantities.
- Irrigation, from its own plan, which is frequently not in the paving set at all.
- Rolled against vertical curb, and the transitions between them, each of which is a formed item.
- Striping, signage and wheel stops as counts.
Documents needed to price it
- Site and paving plans with sections
- Landscape and irrigation plans
- Civil details for curb profiles
- The Division 32 specifications
Questions people in this trade actually ask
Is the base in the paving price?
The section is identified and priced as a section, base and surface together, so a thicker base is visible rather than hidden in a square foot rate.
Work of this kind
- Construction
Municipal street widening
California Central Valley
Public works unit price bid. Quantity audit carried in both cubic yards and tons, with colour coded markups.
Estimating & Takeoff / Bid & Proposal Support
- Construction
Express car wash, new build
Southern California
Grading, concrete, storm drain and bioretention, sanitary sewer, landscape, site lighting and alley reconstruction. Seven scopes consolidated into one proposal.
Estimating & Takeoff / Bid & Proposal Support
The service behind this
Estimating & TakeoffRelated divisions
Bidding Division 32 work?
Send the documents and the bid date. A written fee and turnaround come back before anything is measured.