Skip to main content

Try a trade, a service or a scope. For example concrete restoration, shop drawings, or acoustical ceilings.

Division 10 / Estimated

Division 10 specialties estimating

Division 10 is a hundred small counts. Every one of them lives on a schedule, and every one of them is missed by anyone counting symbols on a plan.

What we measure, and in what units

  • EA by item, from the schedules

What the deliverable looks like for this division

Each item counted from its schedule and reconciled against the plan and the interior elevations, with mounting and blocking implications passed to Division 06.

Scope items routinely missed on this division

Only someone who has priced the work knows what falls through the gaps. No competitor publishes this list.

  • Toilet accessories and partitions counted from the schedule and the enlarged plans, not from the floor plan symbols.
  • Signage, including code required signage that appears only in the specification.
  • Fire extinguishers and cabinets, counted from the life safety plan.
  • Corner guards, wall protection and lockers, which are linear feet and counts respectively.

Documents needed to price it

  • The specialties schedules
  • Enlarged plans and interior elevations
  • The life safety plan
  • The Division 10 specifications

Questions people in this trade actually ask

Why not count from the floor plan?

Because half of it is not on the floor plan. It is on the enlarged toilet room plan, the interior elevations, the life safety plan and in the specification.

The service behind this

Estimating & Takeoff

Related divisions

Bidding Division 10 work?

Send the documents and the bid date. A written fee and turnaround come back before anything is measured.