Division 06 rough carpentry and millwork estimating
Framing is measured in the material it is bought in and installed in. The item that is never drawn and always needed is blocking.
What we measure, and in what units
- BF and LF framing by size
- SF sheathing by type
- LF millwork and trim
- EA casework units
- EA hardware sets on casework
What the deliverable looks like for this division
Studs, plates, headers and joists by size and count from the framing plans, sheathing by area and type, millwork by run from the interior elevations and casework by unit from the schedule.
Scope items routinely missed on this division
Only someone who has priced the work knows what falls through the gaps. No competitor publishes this list.
- Blocking and backing, which are drawn nowhere and needed everywhere: behind every wall mounted item, at every cabinet run, at every rail.
- Hardware on casework, priced as sets rather than assumed in the unit.
- Fire retardant treated material where the specification requires it in specific locations only.
- Waste on sheathing and framing carried separately from the measured quantity.
Documents needed to price it
- Framing plans and sections
- Interior elevations and casework schedule
- The rough carpentry and millwork specifications
- The backing schedule if one exists
Questions people in this trade actually ask
Where does blocking come from if it is not drawn?
From every item that mounts to a wall, on the architectural drawings and the equipment schedules, plus the backing schedule where the architect issued one. It is counted, not allowed for.
Is casework priced by the unit or by the run?
By the unit from the schedule, with hardware as sets, because that is how it is bought.
Work of this kind
- Construction
Residential remodel and addition
Arizona high desert
Sixteen trades from demolition through electrical, including septic and deck. 132 line items.
Estimating & Takeoff
The service behind this
Estimating & TakeoffRelated divisions
Bidding Division 06 work?
Send the documents and the bid date. A written fee and turnaround come back before anything is measured.